Unit: 1000 g | Shipping Weight: 1000 g | Stock Available: 2 unit | Sold:1unit |
0 - 4 | 5 - 9 | 10 - 14 | 15+ | |
---|---|---|---|---|
US $11.50 | US $10.93 | US $10.35 | US $9.20 | US $11.50 |
Color | Light Yellow |
Color Treatment | Dyed |
Usage | Beads |
Hole Style | Center Drilled |
Finish | Lead Free |
Shape | Oval |
Material | Maple Wood |
Size: about 23mm long, 8~9mm wide, Hole: 2.5mm; about 2000pcs/1000g.
Priced per 1000 g
1. The image must be in one of the following formats: .jpg, .png, .jpeg, .bmp, .gif, .webp, .tiff, .ppm
2. The size of the image should be less than 5M!
3. The image length and width must be greater than or equal 200 pixels and smaller than or equal to 1024pixes.
1. The image must be in one of the following formats: .jpg, .png, .jpeg, .bmp, .gif, .webp, .tiff, .ppm
2. The size of the image should be less than 5M!
3. The image length and width must be greater than or equal 200 pixels and smaller than or equal to 1024pixes.
Uploading File